page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144

JKX Oil & Gas plc Annual Report 201153At a glance01-17Board statements18-23Operational review24-36Financial review37-47CSR review48-61Directors' reports62-83Financial statements84-136. a preliminary hazard analysis to support the development application by demonstrating that risk levels do not preclude approval. a fire, safety and explosion studies, emergency response plans and updated hazard analysis undertaken during the design phase of projects. a construction safety study to ensure facility safety during construction and commissioning, particularly when there is interaction with existing operations. implementation of a safety management system to give on-going safety assurance during operations. regular independent hazard audits to verify the integrity of the safety systems and that the facility is being operated in accordance with its hazards-related conditions of consent. independent risk control using a structured process of identifying, measuring, monitoring and reporting risks. Cable pulling at our Koshekhablskoye facility - over 250km of cable was installed during 2011

54CSR review EnvironmentWe work hard to protect our people, their communities and also the environment, both close to our projects and in the wider world.We were very proud to achieve ISO 14001 Environmental Management accreditation in 2011. ISO 14001 is the principal management system standard which specifi es the requirements for the formulation and maintenance of an Environmental Management System. The environmental performance of our operations has implications for our relationships with our people, their communities, partner organisations, the media, governments, investors and other stakeholders.In 2011, we were pleased to continue the ongoing work with The Carbon Disclosure Project on our Carbon Management Plan. Our performance was good for 2011 even with a significant increase in construction in Russia.We have started a more detailed baseline study to engage in Supply Chain Management in the Carbon Disclosure Project during 2012.We have committed to reducing emissions by 12.5%, from 2008 to the end of 2012, in line with EU targets. Having initiated a reduction programme in 2009, we are well on our way to achieving this target by the end of 2012. With significant construction in 2011, our risk assessment processes identified the possibility that emissions would increase during the year. Despite the increase in production and construction activity, emissions remained within expected levels in 2011. We are confident that 2012 will see a controlled reduction in emissions.Climate change We recognise that CO2 and CH4 emissions from the use of hydrocarbons in our exploration and production activities contribute to climate change. These are generated primarily through operating combustion engines, cold venting of gas, electricity generation and well test operations.We monitor CO2 and CH4 emissions attributable to drilling, well testing and production across the Group allowing the targeting and implementing of appropriate reduction strategies. In Poltava and Koshekhablskoye our terminals are now self-sufficient and can maintain operations without the need for grid electricity, improving security of supply.In Ukraine, at our central production facilities, we upgraded generators resulting in improved emissions performance. It also means greater resilience for site production given the reduced requirement for diesel. The concept of climate change and the manner in which we work to reduce our potential contribution is an ongoing activity. In 2012 we are planning to assess how we can assist the Clean Development ObjectivesAchievementsReducing EmissionsZero discharge of chemicals to landor surface watersRestored habitat and hydrologicalregime to pre-construction state as soon as reasonably practicalNo loss of containment of productConsulting with Stakeholders ie localcommunities, workforce, NGOs and government agenciesContinuously monitoredWe continuously seek new initiatives to reduce emissions and monitor the impact we have on the environment. Baseline studies have been completed in Russia and environmental monitoring systemshave been identified , installed and in operationAchieved in 2011; continuously monitoredAchieved in 2011; continuously monitoredAchieved in 2011; continuously monitoredBy following the same rules and working together towards consistent goals, we can have a moremeaningful and quicker impact ongreenhouse gas reductions and improve our communities.