page 1 page 2 page 3 page 4 page 5 page 6 page 7 page 8 page 9 page 10 page 11 page 12 page 13 page 14 page 15 page 16 page 17 page 18 page 19 page 20 page 21 page 22 page 23 page 24 page 25 page 26 page 27 page 28 page 29 page 30 page 31 page 32 page 33 page 34 page 35 page 36 page 37 page 38 page 39 page 40 page 41 page 42 page 43 page 44 page 45 page 46 page 47 page 48 page 49 page 50 page 51 page 52 page 53 page 54 page 55 page 56 page 57 page 58 page 59 page 60 page 61 page 62 page 63 page 64 page 65 page 66 page 67 page 68 page 69 page 70 page 71 page 72 page 73 page 74 page 75 page 76 page 77 page 78 page 79 page 80 page 81 page 82 page 83 page 84 page 85 page 86 page 87 page 88 page 89 page 90 page 91 page 92 page 93 page 94 page 95 page 96 page 97 page 98 page 99 page 100 page 101 page 102 page 103 page 104 page 105 page 106 page 107 page 108 page 109 page 110 page 111 page 112 page 113 page 114 page 115 page 116 page 117 page 118 page 119 page 120 page 121 page 122 page 123 page 124 page 125 page 126 page 127 page 128 page 129 page 130 page 131 page 132 page 133 page 134 page 135 page 136 page 137 page 138 page 139 page 140 page 141 page 142 page 143 page 144
|
JKX Oil & Gas plc Annual Report 201153At a glance01-17Board statements18-23Operational review24-36Financial review37-47CSR review48-61Directors' reports62-83Financial statements84-136. a preliminary hazard analysis to support the development application by demonstrating that risk levels do not preclude approval. a fire, safety and explosion studies, emergency response plans and updated hazard analysis undertaken during the design phase of projects. a construction safety study to ensure facility safety during construction and commissioning, particularly when there is interaction with existing operations. implementation of a safety management system to give on-going safety assurance during operations. regular independent hazard audits to verify the integrity of the safety systems and that the facility is being operated in accordance with its hazards-related conditions of consent. independent risk control using a structured process of identifying, measuring, monitoring and reporting risks. Cable pulling at our Koshekhablskoye facility - over 250km of cable was installed during 2011 54CSR review EnvironmentWe work hard to protect our people, their communities and also the environment, both close to our projects and in the wider world.We were very proud to achieve ISO 14001 Environmental Management accreditation in 2011. ISO 14001 is the principal management system standard which specifi es the requirements for the formulation and maintenance of an Environmental Management System. The environmental performance of our operations has implications for our relationships with our people, their communities, partner organisations, the media, governments, investors and other stakeholders.In 2011, we were pleased to continue the ongoing work with The Carbon Disclosure Project on our Carbon Management Plan. Our performance was good for 2011 even with a significant increase in construction in Russia.We have started a more detailed baseline study to engage in Supply Chain Management in the Carbon Disclosure Project during 2012.We have committed to reducing emissions by 12.5%, from 2008 to the end of 2012, in line with EU targets. Having initiated a reduction programme in 2009, we are well on our way to achieving this target by the end of 2012. With significant construction in 2011, our risk assessment processes identified the possibility that emissions would increase during the year. Despite the increase in production and construction activity, emissions remained within expected levels in 2011. We are confident that 2012 will see a controlled reduction in emissions.Climate change We recognise that CO2 and CH4 emissions from the use of hydrocarbons in our exploration and production activities contribute to climate change. These are generated primarily through operating combustion engines, cold venting of gas, electricity generation and well test operations.We monitor CO2 and CH4 emissions attributable to drilling, well testing and production across the Group allowing the targeting and implementing of appropriate reduction strategies. In Poltava and Koshekhablskoye our terminals are now self-sufficient and can maintain operations without the need for grid electricity, improving security of supply.In Ukraine, at our central production facilities, we upgraded generators resulting in improved emissions performance. It also means greater resilience for site production given the reduced requirement for diesel. The concept of climate change and the manner in which we work to reduce our potential contribution is an ongoing activity. In 2012 we are planning to assess how we can assist the Clean Development ObjectivesAchievementsReducing EmissionsZero discharge of chemicals to landor surface watersRestored habitat and hydrologicalregime to pre-construction state as soon as reasonably practicalNo loss of containment of productConsulting with Stakeholders ie localcommunities, workforce, NGOs and government agenciesContinuously monitoredWe continuously seek new initiatives to reduce emissions and monitor the impact we have on the environment. Baseline studies have been completed in Russia and environmental monitoring systemshave been identified , installed and in operationAchieved in 2011; continuously monitoredAchieved in 2011; continuously monitoredAchieved in 2011; continuously monitoredBy following the same rules and working together towards consistent goals, we can have a moremeaningful and quicker impact ongreenhouse gas reductions and improve our communities. |